Verification
Bring-up, assembly and bench procedures with explicit evidence limits.
These pages document procedures for current bring-up and earlier Board B hardware. Use release readiness to check current manufacturing status. A procedure by itself does not establish measured qualification.
Procedures
Renewal prototype bring-up covers staged checks for the current Board P and redesigned Board B.
Regulator assembly and inspection documents the earlier linear-regulator stage assembly checklist.
Power rail bench test describes bench tests for the earlier Board B regulator stage.
Revision History
CreatedUpdated